Skip to content
The Restaurant Accelerator is open for applications. See if you are a fit

How Do You Build a Pro Forma for a New Restaurant Location?

Want my team to install this in your restaurant instead? see if you are a fit.

Author: Alex Yanovsky Published November 2, 2026| 7 min read

How Do You Build a Pro Forma for a New Restaurant Location?

Earnings disclaimer: nothing on this page is a promise or guarantee of results. Client outcomes shown on this site are real but not typical, and depend on each owner's business, market, team and effort. The Scaling Engine provides education and coaching and does not guarantee revenue, profit or growth. Any figures referenced here are past results or illustrations, not projections of what you will earn.

A pro forma for a new location starts with the real numbers of the restaurant already open, adds the true cost to open the new site from contractor quotes, and replaces a full month on day one with a ramp. That ramp changes the payback in months, and a bad case built the same way shows how much cash the project really needs before it is worth going to.

The Restaurant Accelerator

Want the restaurant to run without you? See what it takes.

Start your application

What is a pro forma for a new restaurant location?

A pro forma is a month by month projection, built from the existing location's real numbers and the new site's real quotes, that shows how long the next location takes to pay back what it cost to open.

It is not a forecast pulled from a broker's pitch or a franchise brochure. It is built from four things: the sales a full month does, what a dollar of those sales keeps after variable costs, the fixed costs of the new site, and a ramp that shows how slowly a new location climbs before it does a full month of sales. None of those four numbers should come from anyone else's restaurant.

Once the doors open, the pro forma stops being a projection and becomes the plan the real months get compared against. It is a projection, not a promise, to an owner, a partner, or a lender.

Where do the starting numbers come from?

Each number in the pro forma has one correct source: sales and what a dollar keeps come from the location already running, fixed costs come from the new site's own lease and schedule, and the ramp comes from the first location's own first year.

Sales in a full month come from the operating P&L of the location already running. What a dollar keeps after variable costs comes from that same location's unit economics. Fixed costs for the new site come from its own letter of intent for rent and a real schedule for the crew floor, never copied from the existing location. The ramp comes from the first location's first year, from its old P&Ls or the POS.

In a worked example, a location doing $1,500,000 a year does $125,000 of sales a month. At 40 cents kept per dollar, that is $50,000 kept. Fixed costs of $450,000 a year work out to $37,500 a month. $50,000 less $37,500 leaves $12,500 of profit a month, once the location is running at a full month of sales.

Three things change at a new address: the rent, which follows the new lease and may not resemble the existing one, the sales, which start without a single regular customer, and the team, which is new and slower until it is trained. Systems get copied to a new location. People and their regulars do not.

What does it actually cost to open a new location?

The cost to open is everything that happens before the first paying guest: build-out and equipment, deposits and permits, rent and payroll during the months before opening, and the opening stock and soft open nights.

That figure comes from contractor and supplier quotes for the new site, not from whatever the first location happened to cost. Prices move, and the only person who should be collecting those quotes is a controller, not the owner.

In the worked example, the first location cost $600,000 to open, and the quotes for the next one come back at the same $600,000. A real pro forma uses whatever the actual quotes say, even if that number looks nothing like what the first location cost.

Results are not typical and will vary with your business, your market, your team and how much of the work you actually do. Client figures on this site come from recorded interviews and are dated. Nothing here is a guarantee of revenue, profit or growth.

Why does a ramp change the payback so much?

A pro forma that assumes a full month of sales from day one gives a shorter payback than reality, because a new location with no regulars and an untrained team climbs to a full month over roughly its first year, not on opening night.

The simplest version of a pro forma divides the cost to open by the profit of a full month. In the worked example, $600,000 divided by $12,500 gives 48 months, the same payback as the existing location. That assumes the new site sells a full month's worth from its first day, which is the best case, not the base case.

Add a ramp built from the first location's own first year and the picture changes. Profit by quarter in the worked example runs a loss in the first quarter, a smaller loss in the second, a profit in the third, and a larger profit in the fourth, for quarterly totals of minus $22,500, minus $7,500, plus $7,500, and plus $22,500. Add those four quarters together and they sum to $0. A full year of work, and the location has only paid its own way, nothing more. The $600,000 is still outstanding. From month thirteen it earns $12,500 a month, so it takes 48 more months to pay that back, for a total of 60 months.

Pro formaProfit a month, once fullPayback
Full month from day one$12,50048 months
With a ramp built from the first year$12,50060 months

Same location, same quotes, two very different answers. The ramp also costs cash along the way. The low point in the worked example comes at month six, where the first two quarters' losses add up to minus $30,000. After that the location starts climbing back. The project does not need $600,000. It needs $600,000 plus whatever that low point turns out to be, and that is the number a later step of the plan has to find money for.

Where should the ramp assumption come from?

The ramp should come from the first location's own first twelve months, and any ramp that looks faster than that needs a stated reason, like a busier street or a team that has opened before.

If an owner cannot find that first year's numbers, the fix is not to guess quietly. It is to write the assumed ramp down, label it as an assumption, and have it checked on a regular basis rather than left to sit unexamined inside a spreadsheet.

What does the bad case tell you, and why build one at all?

The bad case applies a slower ramp and a lower ceiling to the same numbers, and it is the version that decides how much cash the project actually needs to survive.

The bad case in the worked example stretches each stage of the ramp and assumes the location tops out below where the first one landed, while fixed costs stay the same because rent does not move just because a month went softer than hoped. Losses run to $30,000 over the first stretch, then another $10,000 over the next, taking the low point to $40,000. The location earns $10,000 back over the stretch after that, then settles into a profit of $7,500 a month.

CaseLowest pointPayback
With a rampminus $30,000 by month six60 months
Bad caseminus $40,000 by month eight96 months

On the bad case, $600,000 plus the $30,000 needed to cover the low point, divided by $7,500 a month, comes to 84 more months of payback. Add the first 12 months and the total runs to 96 months. The bad case is not meant to be the expected outcome. It is the version an owner funds against, because it sets the amount of cash that has to be available if the slower, smaller version is the one that actually happens.

How does the pro forma fit with the rest of an expansion plan?

The pro forma answers whether the next location is worth going to and how much money it really needs, which is a different question from whether the current location can run without its owner.

A separate check on the current location establishes whether it can run without the owner in the room day to day. The pro forma picks up after that and works out whether opening a second location is worth the cash and time it takes, using the real numbers of the location already open rather than borrowed ones. For owners who want a structured way to work through that test and the pro forma side by side, the Founders Board gives access to the same system and weekly review used to build this lesson, and case studies show how other owners carried their own numbers through it.

Questions

The short answers.

What four numbers does a restaurant pro forma need?

It needs the full month's sales and what a dollar keeps, both from the existing location's own P&L, the new site's fixed costs from its lease and schedule, and a ramp showing how slowly sales build, taken from the first location's own first year.

Why not just use the first location's payback number for the next one?

Because that payback assumes a full month of sales from day one with a trained team, which does not describe a new site with no regulars yet. A ramp built from the first year's real climb gives a longer, more realistic payback.

How much cash does a new location actually need?

More than just the cost to open. It needs the cost to open plus whatever the lowest point of its cash position turns out to be once a ramp, or a bad case, is applied to the numbers.

Is a pro forma a guarantee of how a new location will perform?

No. A pro forma is a projection built from the best evidence available at the time, and once the location opens, it becomes the plan the real months are compared against rather than a promise of a result.

About the author

Alex Yanovsky is head coach at The Scaling Engine. He built Sushi Master to 735 locations, roughly 10,000 employees and about $200 million a year, and leads the weekly F&B Founders Board calls. Posts are edited from his course lessons and coaching calls. Benchmarks come from the Scaling Engine OS™; client figures come from recorded interviews and are dated on the case studies.